Pool Deck Cost

A new pool deck typically includes site preparation, forming, reinforcement, concrete placement, finishing, and joints around the pool area. Southern California costs vary with deck size and layout, access for crews and concrete delivery, base conditions, drainage requirements, and the selected finish. Curves, coping transitions, and other detailed work around the pool can increase labor.

Typical range: $13–$30 per square foot — Southern California (2026 pricing)

What moves the price

  • Site access — Narrow side yards, occupied properties, and limited access for concrete trucks or pumping equipment can increase labor and placement costs.
  • Deck shape and detailing — Curved pool edges, drains, steps, coping transitions, and numerous penetrations require additional forming and hand finishing.
  • Base preparation — Excavation depth, grading, compaction, and the amount of aggregate base needed depend on existing soil and site conditions.
  • Reinforcement and thickness — Specified slab thickness and the type and spacing of reinforcing steel affect material and installation costs.
  • Finish selection — Broom finishes, decorative textures, colors, and more labor-intensive surface treatments have different material and finishing requirements.